可移动检测站建设指南南卡罗来纳美国(2)
【作者】网站采编
【关键词】
【摘要】The PPOD is flexible in mobility for increased access, in application for various sites, and potential future applications. This model has a site-less approach due to this flexibility, with the abilit
The PPOD is flexible in mobility for increased access, in application for various sites, and potential future applications. This model has a site-less approach due to this flexibility, with the ability to be stand-alone or in multiples. The standard size functioning strictly for testing and the accessible size acting as a self-contained option for both registration and testing. Economically, a site of six PPODs can start up for around 15,000 USD with additional costs of "X" for staff. It nearly eliminates the need for PPE and increases safety as patients and personnel are separated between the Red and Green Zones by the structure and integrated gloves themselves.
The goal is to develop this method and design to be implemented permanently as a stand-alone supplement to any healthcare facility design and plan as a first line defense for patient registration upon arriving on-site, as well as becoming the future for virus testing as a whole so that patients can be safely and efficiently tested.
4 可移动检测站现场测试/PPOD testing in field
5 可移动检测站概念平面/PPOD concept plan
6 可移动检测站组装照片/PPOD assembly photos
7 可移动检测站大型场地布局及剖面/PPOD large site layout and section
8 可移动检测站立面/PPOD elevation
项目信息/Credits and Data
地点/Location:美国南卡罗来纳州查尔斯顿/Charleston, South Carolina, USA
客户/Client: Medical University of South Carolina (MUSC)
设计团队/Design Team:
David Pastre/Clemson University School of Architecture Justin Acevedo, Ryan Bing, Jeremy Eaton, Mohamed Fakhry, Luke Gibson, Audrey Hesson, DJ Holmes, Steve Kurtz, Henry Lee III, Andrew Matthews, Claire Mcmanus, William Poynor, Courtney Wolff/Clemson University Architecture + Community Build Students
合作/Collaborators:
Erik Modrzynski, Kimberlyn Whitaker, Mary P. Mauldin/MUSC
Simeon A. Warren/National Centre for Preservation Technology and Training
Paul Mosher/Cluck Design Collaborative
Will Bullock/Will Bullock Creative
施工/Construction:Meadors, Inc. Millwork
顾问/Consultant: Jeff Polutta, Trash Gurl LLC.
材料/Material: 全新/再利用/移动厕所/New/Repurposed Porta-Potty
建筑面积/Floor Area: 标志型–约1.347m2/Standard – Approx. 14.5 ft2, 无障碍型–约2.415 m2/Accessible – Approx. 26 ft2
造价/Cost: Approx. 2500 USD/PPOD with additional costs of "X" for staff on-site
设计周期/Design Period: (调研记录/Research and Documentation), (设计组装/Design and Assembly)
建造时间/Construction Period: 2020年夏季/Summer 2020完成时间/Completion Time: 首期6个月且仍在实施中/6 month initial phase; On-going for continued production
绘图/Drawings: Clemson University Architecture + Community Build Students